March 2024 Progress Report
Project 3
Camp Quay Kids Room Grand Opening! Our amazing new children’s wing multi-purpose room (with fabulous extra storage closets) has been named Camp Quay Kids. It was designed as a special space for kids to learn about God and feel connected to God’s creation. The larger space is a huge benefit for our ministry with children and families – the room will be used daily by groups including:
- Gathering and worship for all elementary school children
- Sunday School for 3rd-5th Grade Class at 10:00am
- Kids for Christ Sunday Night Small Group
- Kids NPraise Rotations
- Preschool Music, Active Kids, and Special Events
- Childcare — which is now called Camp Quay Kids!
Project 4
Centrum Updates – As you may have heard in worship – the speaker system original to our building (a.k.a. 25 years old) is no longer functional. Design work for a new audio system has been in process as part of Project 4. THANKS TO YOUR GENEROSITY, the required funding is in place, and we are moving as quickly as possible to replace that equipment. Because it has to be custom-built for our space, we are using temporary speakers for the next several weeks.
Project 6
Accessibility Ramp in Centrum – Construction on an ADA-accessible ramp from the centrum floor to the stage will start next week. The ramp will be located along the front left wall of the centrum (sound booth side). The design includes extra storage around the ramp and on the opposite wall (near the playground door) for our Sacred Settings worship design team.
Project 1
Adult Wing Multi-Purpose Room – Construction continues on the large room at the end of the adult wing hallway. This renovation includes a new side exit (toward the chapel) and two storage closets. The new exit will make it easier for folks to use the limited-mobility parking spaces at the rear of the building. Just a reminder that this project has taken extra time because it was important for us to ensure the as-built drawings matched conditions in the field. We have completed an extensive engineering evaluation in the adult wing with a focus on structural safety.
Project 11
New Roof – Completed in fall 2023!
Project 2
Restroom Construction Continues – For the new Family Restroom, the wall framing is complete and the ADA-accessible shower has been installed. Plumbing and drywall are in progress for the sinks and shower, and the new hallway door was installed.
Adult Wing Restrooms Completed! There was indeed much rejoicing as we celebrated the grand re-opening of our adult wing restrooms. Sporting new tile flooring, updated paint, and new commodes, everything feels fresh and new. The Children’s Wing Restrooms are now closed so that the same updates can be completed in those spaces.